Road Construction

The construction of a new road – whether from asphalt or concrete – requires the production of an excellently bonded pavement structure, beginning with a stable base layer and going all the way to a precisely leveled surface course.

What are the most important criteria to be considered? What methods need to be applied? What machines used?

  • Flexible Pavement
  • Rigid Pavement
  • Culvert and Drain Construction
  • Sub-Base Stabilization